China, Guangzhou Subway


Description:  Line no 2, Zhong-Xiao Section, with total tunnel length of 1,981 m. Works includes tunnel excavation, concrete lining, water proof & drainage work, cabling, lighting, ventilation and other related works.
Duration of Works:  2000-2002.

Next      Back to Railway