China, Tianjin Subway


Description:  Line no 2. Lot 8. Works includes tunnel excavation, concrete lining, water proof & drainage work, cabling, lighting, ventilation and other related works.
Duration of Works:  Sept 2007-June 2011

\
Next      Back to Railway