Sinohydro Logo

Malaysia, Mukah 132/275KV Power Transmission and Distribution Project


Location:  in Sarawak, east Malaysia, on the island of Borneo
Duration of Works:   2006-2008
Feature:  86 km long.

Next      Back to Power Transmission