Sinohydro Logo

Ethiopia, Tekeze Hydropower Station


Location:  Upper Stream of Tekezé River, Tignia, Ethiopia
Capacity:  300 MW
Reservoir:  9 billion m3
Dam Type:  Double Curvature Concrete Dam, 188 m high
Owner:  Ethiopian Electric Power Corporation
Work Duration:  2002-2009
Financier:  Ethiopian Government
Feature:  The Highest Double Curve Dam in Africa

Next      Back to Hydropower