Ecuador Coca Codo-Sinclair (CCS) HPP


Location:  Located on the Coca River, a tributary of the Napo River
Description:  EPC contract.a concrete faced rockfill dam 53 m high Total installation capacity 1 500 MW. The plant is expected to meet 44% of the country’s energy demand by 2013.
Contractual Amount:  USD 2.3 billion .
Owner:  Empresa Pública Estratégica Hidroeléctrica (Coca Codo-Sinclair
Work Duration:  July 2010-July 2016
Financier:  The Export-Import Bank of China provides 85% of credit loans.