Equatorial Guinea, Djiploho Hydropower Plant


Location:   In the middle of the Wele River
Capacity:   120 MW
Dam Type:  Concrete Gravity Dam, 22 m high, 274 m long
Contract Type:  EPC contract
Owner:  Ministry of Mine, Industry and Energy
Work Duration:  2008-2012
Financier:  The Equatorial Guinea government funded the project with assistance of China EXIM Bank
Feature:  The largest hydropower station of the country

Next      Back to Hydropower