Lao PDR, Nam Ngum 5 Hydropower Project


Location:  one of the six and the last of the hydroelectricity projects in the Nam Ngum river networks, Lao PDR
Capacity:  120MW
Duration of Works:  Oct. 2008-Nov. 2012 (Construction); 25 years (Operation)
Dam Type:  RCC Gravity Dam, 104.5 m high
Contract Type:  BOT
Financier:  SINOHYDRO

Next      Back to BOT