Description: A 30m-high, 1.5 km-long embankment dam. The dam has a volume of 1.4 x 106 m3, and is equipped with an ungated 180 m-long ogee crest spillway, a reinforced concrete intake tower and steel line doublets conduit, and an irrigation water supply main pipeline 6 km long.
Owner: Botswana Department of Water Affairs.
Contractual amount: USD 100.7 million.
Duration of works: Feb. 2009-2012.
Financier: National Development Fund of Botswana Government
China Headquarters & subsidiaries |
SINOHYDRO Africa |
SINOHYDRO West Asia & North Africa |
SINOHYDRO Eurasia |
SINOHYDRO Americas |
SINOHYDRO Asia Pacific |