Poland, Excavation and expansion of channels in Wroclaw Floodway System WFS and adaptation of the Redzin barrage to pass the flood water


Description:   The main work includes reconstruction of the Odra River corridor from Poznanskie (rail) Bridges to the Widawa’ estuary, adaptation of the City Canal to accommodate flood waters, and adaptation of the Redzin barrage to accommodate the flood water, etc
Work Duration:  784 days
Financier:  World Bank