Excavation and expansion of channels in Weoclaw Floodway System WFS and adaptation of the Redzin barrage to pass the flood water


The project is funded by the World Bank, and the main work includes reconstruction of the Odra Rivercorridorfrom Poznanskie (rail) Bridges to the Widawa estuary, adaptation of the City Canal to accommodat the flood waters, and adaptation of the Redzin barrage to accommodate the flood water, etc. The whole project is scheduled to completed within 784 days.
→ next      Back to Related News